TM 11-5820-880-12
SECTION Vll
MAINTENANCE PROCEDURES
The following maintenance procedures are the responsibility of the organizational maintenance
technician. For maintenance that is required but not in this section, refer to depot support
maintenance.
Termination Unit.
a.
(1) Unkey all transceivers so that all rf input power is removed from the multiplexer.
(2) Loosen the two (2) captive screws that secure the termination unit to the coupler.
(3) Remove the termination unit by pulling straight up, using the termination unit handle, until
separated.
(4) To install a replacement termination unit, reverse the above procedure.
4-10